Saturday 19 April 2014

MANJERA TRINITY CORPORATE DETAILS AT JNTU TO HITECH CITY 120' MAIN ROAD,KUKATPALLY,HYDERABAD-085




       MANJEERA TRINITY CORPORATE
  
 PROJECT – BRIEF DETAILS
   Total Office Leasable Area: 9,50,000 Sqft
   Ample Parking on 5 Levels of Basement Floors
   Ground Floor + 18 Floors of Office Space
   100% Power Back-up with Air-Conditioning High-side
   LEED rated Gold certified Green Building Technology
   High-speed internet with Wi-Fi access availability
  Common business requirements have been designed to      facilitate in-house occupants that include Cafeteria, Travel Desks, Conference Rooms, Banks, ATM etc.
DESIGN FEATURES
  The building is designed based on the ‘Core & Shell’ concept under the IGBC guidelines and all the common area interiors inside the building area are fully finished with 100% power back-up.

   The building has a seismic resistant design with accessibility for the physically challenged and an integrated built-up landscape.

  Treated Fresh-Air is being supplied at all the office floors to improve air quality, thus reduces toxins, odour and provides significant reduction in energy cost of HVAC operations; eco-friendly benefits for the end user.

  The building consists of stepped terraces for every four floors, sun breakers, glass facades that provide a unique characteristic.

  Facade cleaning system is mounted on the terrace area with separate garbage shafts for a cleaner and greener environment.

•  Air conditioning is provided by a central variable flow chilled water recirculation system for maximum energy conservation for both the common and office work areas

   Spaces are fitted out with AHU rooms and connected to central HVAC chiller plant to enable individual customization for optimum comfort with indoor temperature.

   Materials with recycled contents are prioritized and construction waste is diverted into recycle center to minimize the amount of waste going to the landfill.

   The building has been designed incorporating the usage of Green Technologies with a high performance glazing system, sewage treatment plant, rain water harvesting, usage of green construction materials, recycled water management system, zero discharge of water etc.

EFFECTIVE VERTICAL TRANSPORTATION

        Comprehensive vertical transport system is provided with dedicated Lift Lobbies for total 21  Nos Passenger Lifts from MITSUBISHI m ake with Elevator Automatic Rescue Device (ARD) & VVVF Technology are valuable add on units in all elevators.
      
        Basement Lifts
3 Nos - 21 persons capacity - 1.75 m/sec speed – integrated for safety reasons
        Low Rise Lifts
       2 Nos – From Ground to 3rd fl – 14 persons capacity  - 1.75 m/sec speed
        Mid Rise Lifts
8 Nos. - From Ground, 4th - 10th fl – 15 persons capacity - 2.50 m/sec  speed
High Rise Lifts
8 Nos. - From Ground, 11th to 18th fl – 20 persons capacity - 2.50 m/sec speed
Goods Lift
        2 Nos – All Floors - 20 persons capacity - 1.75 m/sec speed
        Fire Safety Lifts
        2 Nos. – All Floors – 10 persons capacity - 1.75 m/sec speed
       Escalators
        Available from Ground to First Floor to handle higher traffic volumes.

PROJECT  SAFETY  FEATURES

  Fully Automated Fire Alarm and Detection System is provided.
    Automatic Sprinkler System is available in all the office floors.
    Provision of Fire Staircases & Fire Hydrants as per DGFS     norms.
    Helipad and Fire Refuge area are provided for Life Safety.
   Integration of BMS (Building Management System) that will optimize the operations cost for the end corporate user.
   Intercom facility with Wi-Fi environment along with the security is provided in all other important spaces within the building premises.
    Rails are to be provided along periphery of terrace enabling cleaning staff to access entire façade on all sides.
    All Electrification is provided with IS certified fixtures & fittings'

No comments:

Post a Comment